
Move a power plant without losing what makes it work.
Decommissioning, relocation and site support for gas turbine and engine power plants, including associated balance of plant.
A second life for power generation.
Plant relocation moves gas turbines and engine power plants, including their balance of plant, from a site where they are no longer needed to one where they are. Done right, the new owner gets proven equipment sooner than a new build allows.
We cover both ends of the journey: decommissioning at the old site, and installation and commissioning at the new one.

Decommissioning of the plant.
A used turbine or engine is only worth what arrives intact. Our team's background in erecting and commissioning power plants is what protects that value.
Audit & match-marking
Site survey and HSE plan, electrical mapping, and match-marking of every flange, pipe and structural interface.
Controlled extraction
Draining and safe disposal of oils and fuels; uncoupling and rigging of main units; removal of enclosures, ducts, stacks and BOP.
Preservation & packing
Nitrogen-blanketed gas paths, moisture-barrier wrapping with desiccant, export crates for loose parts, tooling and spares.
Transport & load-out
Heavy-lift cranes and low-loaders, haulage to port and load-out on the buyer's vessel with customs documentation support.
Installed and commissioned at the new site.
Our expertise extends from dismantling to reassembly. We plan, supervise and support installation and commissioning at the new site.
Site preparation
Layout, foundation and interface checks against the dismantling records before the equipment arrives.
Installation & reassembly
Supervision of setting, alignment and reassembly of turbines, engines, generators and auxiliaries.
Commissioning support
Pre-commissioning checks, cold and hot commissioning, and protection and control testing through to first power.
Site supervision & HSE
Owner's-engineer role on site: progress, quality and HSE follow-up, with clear reporting to the client.

